First Winter Project (Alt. Rebuild)

What a beauty

My job for the winter would be to put the top on...
And could you elaborate on that electronic speedo, please.
 
Yves, didn't you give me one of these?

I remember you giving me an alternator when Carol and I was at your house.
Did you have to get another?
 
Bob yes I give it to you.

last fall I bought another one on EBay ... and rebuilt.
Kind of small project to keep me busy in winter:nuts:
 
speedo

Thanks Yves. It is quite a job.
I copied the link down to my todo list. I may do it sometime...
Thanks
 
Very Nice Work!

What did you use to remove the commutator successfully? I've only seen them resurfaced in situ to remove the ridges in the past.
 
Slip Ring commutator

Hussein,
I unsolder the wires winding from armature and use a small puller.

There is the Website where I bought all the parts:
http://www.aspwholesale.com/

Parts list:
Rectifier IBR304HD-1 $25.10
Bearing 6-2201-4W $7.80 12MM x 32MM x 14MM (NSK 62201DU)
Bearing 6-303-4W $4.20 17MM x 47MM x 14MM (NSK 6303Z)
CAPACITOR 46-91100 $4.90
SLIP RING 28-91851-1 $4.84 17MM x 32.6 MM x24MM
Regulator VR-B192 (0-192-052-013) 14.7V (32mm OD Slip Ring)
 
Back
Top